ADB is seeking a Foreman to join our wireline team and provide proficient level manual laborer and equipment operations. This position will lead the installation of fiber optic cable for various telecommunication projects.
Requirements
- Provides proficient-level manual labor and operations including hand digging with a shovel, setting up traffic control, entry level equipment operations, placing fiber, loading materials, operating equipment, leading crews, etc.
- Proficient with utility print and map reading
- Has performed at least 1 year of independent operating of various equipment (directional drill, mini, plow, hydro, etc.); fully trained in all safety regulations of operating heavy equipment
- Supports and leads the setup and shut down of utility construction projects including traffic control in various conditions including highways, side streets, parking lots, downtown locations, etc.
- Trains other construction crew members on fiber installation practices, print reading, equipment operations, OSHA requirements, etc.
- Loads and unloads materials and equipment in from vehicles at construction yards and jobsites
- Leads by example, ensures safety rules/regulations are followed, and can lead others on jobsites
- Performs OTJ training with Senior Foreman and/or Supervisors to grow skills in the utility construction trade
- Leads the culture of identifying hazards by utilizing the pre-task process
- Performs other position duties when requested
Benefits
- Comprehensive benefits package
- Retirement plan
- Paid time off